Material Handling Network

Sign Up for Network's eNewsletter & Digital Edition

*  Your Email Address:  

subscribe

Product / Dealer / Manufacturer Search

Loading MHN Dealer Search
Browse Dealers by Category
eNet Classifieds Industry Chatter Material Handling Network Featured Products
View Printer Friendly

SMH Elevated Work Platform Project Complete

Friday, April 17, 2009

SMH’s new Elevated Work Platform (EWP) expansion project at the Kansas headquarters has been completed. The project consisted of building a 37,000 square foot mezzanine complete with automated conveyoring to assist in product replenishments and order pulling. The new EWP consists of 3,460 new beams and close to 65 tons of steel, adding 20,000 new stocking locations and increasing the length of the automated conveyor system to over two miles.

Additionally 17 new check-pack stations were added to bring the total number of stations to 33. These additional stations will increase order packing efficiency and help to prevent shipment errors.

For more information on the expansion contact:
Darrell Loomis, Advertising Manager, Systems Material Handling, 16355 South Lone Elm Road, Olathe, KS 66062, toll free phone 800/255-4109, phone 913/829-1000, fax 913/829-6206, www.smhco.com

View all Industry News

Home  |  Subscribe Now  |  Industry News  |  Business Profiles  |  Product Previews  |  Featured Columns
Advertising  |  Media Planner  |  Current Digital Magazine  |  2014 Digital Directory  |  Contact Us

Privacy Policy  |  Site Map

Web Design and Web Development by the OIC Group

Copyright 2014 © Material Handling Network • 217 Loren Street, Washington, IL 61571
Tel: 309-699-4431 • Toll Free: 800-447-6901 • Fax: 309-698-0801
A WoodwardBizMedia Publication